Top-down construction uses the permanent structure floors to strut as the excavation is taken down in stages, floor by floor. Another use of the top-down approach is when creating new metro lines under roads.

What is top and bottom in construction?

Top down construction is the reverse method of bottom-up construction in which the permanent structure is built from top to bottom of the basement along with deep excavations. In this method, the basement floors are constructed as the excavation progresses.

What is up down construction?

The up-down construction method involves the construction of above-grade levels prior to (or in tandem with) the construction of below-grade levels within the same footprint.

Why top down construction method the best choice for the basement?

The main advantage of the top-down approach is that it allows the superstructure to be constructed at the same time as the substructure. Sufficient vertical load capacity of the wall and the internal column supports to support the increasing superstructure load throughout the construction sequence must be ensured.

What is top-down technique?

A “top-down” approach is where an executive decision maker or other top person makes the decisions of how something should be done. This approach is disseminated under their authority to lower levels in the hierarchy, who are, to a greater or lesser extent, bound by them.

What is semi top-down construction method?

the soil is backfilled to the first strut level before removing first level struts or continuing superstructure construction. is constructed from the bottom or the lowest level of basement to the top (from foundation to roof).

How much concrete was used in the Shard?

At around 5,500m3, the concrete pour to create the raft foundation to support the Shard was among the largest undertaken on a UK building, if not Europe. As such, a conventional concrete mix would not do.

What are the advantages of a top-down approach?

The top-down approach can spawn many positive business impacts through unique aspects of management, including the following:

  • Creating clear lines of authority.
  • Standardizing products and services.
  • Facilitating quality control.
  • Streamlining tasks and achieving goals quickly.

What is top-down vs bottom-up?

Bottom-Up: An Overview. Each approach can be quite simple—the top-down approach goes from the general to the specific, and the bottom-up approach begins at the specific and moves to the general. These methods are possible approaches for a wide range of endeavors, such as goal setting, budgeting, and forecasting.

What is top-down approach in project management?

The top-down approach to project management means that you start with the final deliverable (project goal) and break it down into smaller, more manageable tasks. These tasks can be further broken down into subtasks — great details — and then assigned to individual teams and/or team members within that team.